Contract Date
EPROM has been involved in this project since 2022.
About
Location: Cairo, Egypt
Core Business: Manufacturing and supplying steel pipes for the oil, gas, and water industries
Capacity: Produces large-diameter pipes for various infrastructure projects
Products: Steel pipes for petroleum, natural gas, and water transportation
Description
The project is considered one of the digital transformation projects, and includes the establishment of a communications network along the longest pipeline network in Egypt. Which aims to monitor and control transportation networks, raise the efficiency of payment and receipt operations, safe operation of lines and warehouses, and identify the locations of fractures and leaks in the event of their occurrence and quickly control them.
Key Activities
EPROM manages the project and represents the owner of the SCADA systems, also central supervision and facilitation of efficient, reliable and safe operation of pipelines. In addition, EPROM directly supervises:
- Installation of the monitoring and control system on the lines, warehouses and pumping stations.
- Interconnection with the existing control systems of the various pumping stations.
- Installation of a leak detection system on the lines with high accuracy.

